Why the cheapest bid hurt the provider

This is not another article about five smart building trends or ESG reporting. It is about a contract that cost us a lot of time, resources and emotion, and one we still think about. We won it by being the cheapest bidder, and we are still collecting money we were owed.

If you run an FM company, you have probably been in the same room: a client who wants the lowest possible price, a long list of services, and a quiet voice in your head saying “we’ll make it work.” This is what happened when we listened to that voice.

The setup

A developer was finishing a large multifamily development in the Balkan/CEE market and tendered facility management for the whole site. The structure is common in the region, and anyone who has worked with a developer-controlled HOA in the US will recognise it: the developer picks and contracts the provider, but the monthly service charge is paid by the people who buy the apartments.

It was a large site: roughly 120,000 m² across ten tall buildings, with more than 2,000 apartments. Around them sat about a hectare of landscaped green space, playgrounds, garages, a pool, a gym and commercial units on the ground floors.

That split matters more than it seems. The developer was not the one paying in the long run. Its priority was selling apartments, and a low monthly fee is an easy selling point. So the pressure on price came from the client, and it never let up: as low as possible.

At the same time, the standards were high. Buyers of a new complex expect it to look and run well from day one, and the developer’s reputation depended on it.

We wanted the contract, so we accepted the price.

What the price left out

On paper, the scope was clear. In practice, the price had to carry a full on-site team:

  • cleaners
  • gardeners
  • maintenance technicians
  • a facility manager
  • security
  • reception

On top of that came the service contracts for technical maintenance: the regular servicing of building systems that has to happen whether or not anyone has paid.

On a site like this, some systems cost more simply because of what the buildings are. Tall buildings mean many lifts, and lift maintenance was one of the largest fixed costs in the budget. Groundwater pumps had to work every day of the year. Everything else, from fire protection to CCTV, was standard for a complex of this size.

These costs are fixed. Staff are paid every month, and service contractors invoice on schedule. None of it shrinks when income drops. You can’t run half a reception desk or service half a lift.

What the price did not include was the one risk that decided everything: collection. We priced the job as if every invoice would be paid on time. There was no allowance for late payers, no buffer for the months residents need to settle in, and no budget for chasing debt.

How the loss built up

In the first month, collection was around 40%. Nobody panicked. It looked like a teething problem: residents were still moving in, getting used to the building, and only slowly realising that the service charge was a real bill. Not every apartment had been sold yet, either.

For the unsold units, the developer paid every month, on time. That made it look as if everything would be fine once the remaining residents settled in. In fact, it hid the problem. The developer’s payments made the totals look healthier than the residents’ behaviour really was.

We sent polite requests, then reminders, then formal warnings. The first round worked well and lifted collection by about 7 percentage points. Every round after that brought in less than the one before.

Then the pattern became clear. Months went by. New invoices went out while the old ones were still open. And the residents who hadn’t paid in the first month weren’t paying in the second or third either. Non-payment wasn’t spread across the building. It sat with the same group, and their debt grew every month.

Our costs didn’t wait. Payroll and service contracts were paid in full every month, so the gap between what we spent and what we collected kept widening.

How it ended

The first red light came on in September. The contract ended in April of the following year. We tried to renegotiate along the way, but decisions in a large corporation take time, and every month of waiting added another month of unpaid invoices.

The contract was terminated. What followed was enforced debt collection, and it has been slow. Recovering money from many individual debtors takes a long time, and every month spent on it costs time and money that should go into running the business.

There was a reputational cost too. Pursuing the residents of a building you used to manage never looks good, even when you are in the right. In a market where FM contracts often come through references and word of mouth, that matters.

What we would do differently

Looking back, the main mistake wasn’t made in operations. It was made before the contract was signed.

Don’t take the job at the lowest price. If a client wants the cheapest possible fee, ask what that price has to cover and what happens when something goes wrong. A price that only works if everything goes right isn’t a price. It’s a bet.

Price the risk, not just the scope. When residents pay the service charge, collection risk is part of the cost. In our experience, collection on a healthy residential contract usually settles at around 97%, so adding roughly 3% to the price covers the normal gap. The real figure depends on the region and on how reliable the client and the developer are, so there is no universal number. If everything works as expected, 3 to 5% is usually enough.

In our case, even 5% would not have prevented the termination. But it would have covered most of what came after: legal action, court costs, interest and the time spent chasing debt. A provider should carry some risk of its own. The problem is how little room there is: with a planned margin of 7 to 10%, collection below 90% turns a thin profit into a real loss.

It also matters what kind of unpaid money you are looking at. Late payments hurt cash flow, but they eventually come in. Debt that will never be collected is a straight loss, and it needs to be treated differently from the start.

Define the contract clauses in detail. Vague clauses favour whoever is stronger when things go wrong, and that is rarely the provider. Spell out payment terms, what happens when payments are late, and how either side can exit.

Write those clauses so they don’t scare the client off. A contract full of threats can kill a deal at the first meeting. Good clauses read as normal, fair terms at signing, but hold up and work in your favour if there is ever a dispute. That is true of any well-drafted legal document.

Before you sign a similar contract, ask yourself:

  • Who chose us, and who pays us? If they are not the same party, whose interests does the price really serve?
  • What collection rate does our price assume, and what happens to the margin at 60% or 70%?
  • Will the developer guarantee payment for unsold units, or cover shortfalls during a transition period?
  • Can we reduce or suspend services if collection falls below an agreed level?

The cheapest bid didn’t make the building cheaper to run. It moved the risk onto the provider, and the provider paid for it.